Log

Journey to Three Mills

Summary

This is a trip of 1 mile, 5¼ furlongs and 1 lock from Eastway Bridge No 14A to Three Mill Lane Bridge No 3 travelling southeast on the Lee and Stort Navigation (River Lee: commercial section).

This will take 46 minutes.

Route

Lee and Stort Navigation (River Lee: commercial section)
From Eastway Bridge No 14A to:
Hertford Union Canal Junction

Junction of Hertford Union Canal and River Lee
4 furlongs, 0 locks
Bow Bridge No 5

Modern bridge 75yds long. A11
7 furlongs, 1 lock
Three Mill Lane Bridge No 3

Also known as Three Mills Bridge
2¼ furlongs, 0 locks

Totals

Total distance is 1 mile, 5¼ furlongs and 1 lock.

This is made up of 1 mile, 5¼ furlongs of commercial waterways; 1 large lock.

This will take 46 minutes.

 

Standard
Log

Journey to Homerton

Summary

This is a trip of 1 mile, 2¼ furlongs from Turnover Bridge No 19 to Marshgate Bridge No 15 travelling southeast on the Lee and Stort Navigation (River Lee: commercial section).

This will take 20 minutes.

Route

Lee and Stort Navigation (River Lee: commercial section)
From Turnover Bridge No 19 to:
Marshgate Bridge No 15

B112
1 mile, 2¼ furlongs, 0 locks

Totals

Total distance is 1 mile, 2¼ furlongs and 0 locks.

This is made up of 1 mile, 2¼ furlongs of commercial waterways.

This will take 20 minutes. For initial calculation purposes (before adjusting for such things as overnight stops) this is taken as 1 day of 20 minutes.

Standard
Log

Journey to Upper Clapton

Summary

This is a trip of 3 miles, 1 furlong and 2 locks from Tottenham Marshes Pipe Bridge to Turnover Bridge No 19 travelling south on the Lee and Stort Navigation (River Lee: commercial section).

This will take 1 hour and 30 minutes.

Route

Lee and Stort Navigation (River Lee: commercial section)
From Tottenham Marshes Pipe Bridge to:
Tottenham Lock No 17 [see navigational note 1 below] 1 mile, ¾ furlongs, 1 lock
Turnover Bridge No 19 2 miles, ¼ furlongs, 1 lock

Totals

Total distance is 3 miles, 1 furlong and 2 locks.

This is made up of 3 miles, 1 furlong of commercial waterways; 2 large locks.

This will take 1 hour and 30 minutes.

Standard
Log

Journey to Tottenham

Summary

This is a trip of 7 miles and 5 locks from Waltham Town Lock No 11 to Tottenham Lock No 17 traveling south on the Lee and Stort Navigation (River Lee: commercial section).

This will take 3 hours and 32 minutes.

Route

Lee and Stort Navigation (River Lee: commercial section)
From Waltham Town Lock No 11 to:
Enfield Lock No 13 [see navigational note 1 below] 1 mile, 3½ furlongs, 1 lock
Tottenham Lock No 17 [see navigational note 2 below] 5 miles, 4½ furlongs, 4 locks

Totals

Total distance is 7 miles and 5 locks (not counting Waltham Town Lock No 11 and Tottenham Lock No 17).

This is made up of 7 miles of commercial waterways; 5 large locks.

This will take 3 hours and 32 minutes.

 

Standard
Log

Journey to Waltham Town

Summary

This is a trip of 1 mile, 2¼ furlongs and 1 lock from Cheshunt Visitor Moorings to Waltham Town Lock No 11 travelling south on the Lee and Stort Navigation (River Lee).

This will take 34 minutes.

Route

Lee and Stort Navigation (River Lee)
From Cheshunt Visitor Moorings (14 day moorings) to:
Waltham Town Lock No 11 1 mile, 2¼ furlongs, 1 lock

Totals

Total distance is 1 mile, 2¼ furlongs and 1 lock (not counting Waltham Town Lock No 11).

This is made up of 1 mile, 2¼ furlongs of small rivers; 1 broad lock.

This will take 34 minutes.

Standard
Log

Journey to Cheshunt

Summary

This is a trip of 7 miles, ¾ furlongs and 5 locks from Stanstead Marina to Cheshunt Visitor Moorings travelling south on the Lee and Stort Navigation (River Lee).

This will take 3 hours and 1 minute.

Route

Lee and Stort Navigation (River Lee)
From Stanstead Marina (Also known as Lee Valley Marina Stanstead Abbots) to:
Rye House Bridge No 58

With Pipe Bridge alongside
1 mile, 1¼ furlongs, 0 locks
Rye House Junction

Junction of Rivers Stort and Lee
4 furlongs, 0 locks
Cheshunt Visitor Moorings

14 day moorings
5 miles, 3½ furlongs, 5 locks

Totals

Total distance is 7 miles, ¾ furlongs and 5 locks Today’s travel includes at least 1 small aqueduct or underbridge.

This is made up of 7 miles, ¾ furlongs of small rivers; 5 broad locks.

This will take 3 hours and 1 minute.

Standard
Log

Journey to Stanstead Abbott’s Marina

Summary

This is a trip of 4 miles, 2½ furlongs and 3 locks from Broxbourne Rowing Club to Stanstead Marina travelling north on the Lee and Stort Navigation (River Lee).

This will take 2 hours and 11 minutes.

Route

Lee and Stort Navigation (River Lee)
From Broxbourne Rowing Club to:
Rye House Junction

Junction of Rivers Stort and Lee
2 miles, 5¼ furlongs, 3 locks
Rye House Bridge No 58

With Pipe Bridge alongside
4 furlongs, 0 locks
Stanstead Marina

Also known as Lee Valley Marina Stanstead Abbots
1 mile, 1¼ furlongs, 0 locks

Totals

Total distance is 4 miles, 2½ furlongs and 3 locks.

This is made up of 4 miles, 2½ furlongs of small rivers; 3 broad locks.

This will take 2 hours and 11 minutes.

Standard
Log

Journey back to Broxbourne

Summary

This is a trip of 9 miles, 7½ furlongs and 11 locks from Footbridge No 26 to Broxbourne Rowing Club.

This will take 5 hours and 14 minutes.

From Footbridge No 26 travel west on the Lee and Stort Navigation (River Stort – Main Line) for 7 miles, 2¼ furlongs and 8 locks to Rye House Junction, then travel southwest on the Lee and Stort Navigation (River Lee) for 2 miles, 5¼ furlongs and 3 locks to Broxbourne Rowing Club.

Route

Lee and Stort Navigation (River Stort – Main Line)
From Footbridge No 26 (The Pincey Brook flows into the navigation – No Access) to:
Harlow Lock No 8

Also known as Harlow Mill Lock
4 furlongs, 0 locks
Roydon Road Bridge No 6

High Street (B181)
5 miles, 3 furlongs, 6 locks
Rye House Junction

Junction of Rivers Stort and Lee
1 mile, 3½ furlongs, 2 locks
Lee and Stort Navigation (River Lee)
From Rye House Junction (Junction of Rivers Stort and Lee) to:
Broxbourne Rowing Club 2 miles, 5¼ furlongs, 3 locks

Totals

Total distance is 9 miles, 7½ furlongs and 11 locks.

This is made up of 9 miles, 7½ furlongs of small rivers; 11 broad locks.

This will take 5 hours and 14 minutes.

 

Standard
Log

Journey to Pishiobury Park

Summary

This is a trip of 5 miles, 7¼ furlongs and 7 locks from Bishop’s Stortford Visitor Moorings to Footbridge No 26 travelling south on the Lee and Stort Navigation (River Stort – Main Line).

This will take 3 hours and 13 minutes.

Route

Lee and Stort Navigation (River Stort – Main Line)
From Bishop’s Stortford Visitor Moorings (14 day moorings) to:
Footbridge No 26

The Pincey Brook flows into the navigation – No Access
5 miles, 7¼ furlongs, 7 locks

Totals

Total distance is 5 miles, 7¼ furlongs and 7 locks.

This is made up of 5 miles, 7¼ furlongs of small rivers; 7 broad locks.

This will take 3 hours and 13 minutes.

Standard
Log

Journey to Bishops Stortford

Summary

This is a trip of 5 miles and 5 locks from Sawbridgeworth Visitor Moorings to Bishop’s Stortford Visitor Moorings travelling north on the Lee and Stort Navigation (River Stort – Main Line).

This will take 2 hours and 54 minutes.

Route

Lee and Stort Navigation (River Stort – Main Line)
From Sawbridgeworth Visitor Moorings (14 day moorings<BR>There are more Visitor Moorings above Sawbridgeworth Lock) to:
Bishop’s Stortford Visitor Moorings

14 day moorings
5 miles, 5 locks

Totals

Total distance is 5 miles and 5 locks. This is made up of 5 miles of small rivers; 5 broad locks. This will take 2 hours and 54 minutes.

 

Standard