Log

Journey to Grendon

Summary

This is a trip of 16 miles, 5¼ furlongs and 11 locks from Stoke Heath Basin to Grendon Wharf Long Term Moorings.

This will take 8 hours and 35 minutes which is 1 day, 1 hour and 35 minutes at 7 hours per day.

From Stoke Heath Basin travel north on the Coventry Canal (Main Line – Coventry to Hawkesbury) for 3 miles, 4 furlongs to Hawkesbury Junction, then travel northwest on the Coventry Canal (Main Line – Hawkesbury to Fazeley) for 13 miles, 1¼ furlongs and 11 locks to Grendon Wharf Long Term Moorings.

Route

Coventry Canal (Main Line – Coventry to Hawkesbury)
From Stoke Heath Basin to:
Exhall Basin [see navigational note 1 below] Having passed through Heath Crescent Tunnel. 3 miles, 2¾ furlongs, 0 locks
Hawkesbury Junction

Junction of the Coventry Canal Main Line with the Oxford Canal Northern Section.
1¼ furlongs, 0 locks
Coventry Canal (Main Line – Hawkesbury to Fazeley)
From Hawkesbury Junction (Junction of the Coventry Canal Main Line with the Oxford Canal Northern Section.) to:
Hawkesbury Engine House

Also known as Hawkesbury Pumping Station
½ furlongs, 0 locks
Bedworth Winding Hole

Site of the junction with the Newdigate Colliery Arm (disused)
6¾ furlongs, 0 locks
Bedworth Hill Bridge No 13

Half a mile walk to Bedworth. @Coalpit Fields Road, Bedworth, Nuneaton and Bedworth, Warwickshire, England, United Kingdom
a few yards, 0 locks
Marston Bridge No 15

Marston Lane
1 mile, 6¾ furlongs, 0 locks
Marston Junction

Junction of Ashby and Coventry Canals
½ furlongs, 0 locks
Nuneaton to Bedworth Railway Bridge 1 mile, 7¾ furlongs, 0 locks
Nuneaton Visitor Moorings ¾ furlongs, 0 locks
Boot Bridge No 20

Nuneaton Town centre northeast from here
¼ furlongs, 0 locks
Wash Lane Winding Hole 6 furlongs, 0 locks
Tuttle Hill Bridge No 23

Nuneaton Town centre south from here. @Tuttle Hill / Midland Road, Nuneaton, Nuneaton and Bedworth, Warwickshire, England, United Kingdom (B4114)
5¼ furlongs, 0 locks
Judds Quarry Railway Bridge (disused)

Connected with Judds Quarry
½ furlongs, 0 locks
Springwood Haven Marina 1 mile, ¾ furlongs, 0 locks
Hartshill Wharf and BW Yard 1 mile, 2¾ furlongs, 0 locks
Mancetter Bridge No 36

Mancetter village half a mile east. Quarry Lane
1 mile, ¾ furlongs, 0 locks
Atherstone Visitor Moorings 7 furlongs, 0 locks
Atherstone Top Lock No 1 1 furlong, 0 locks
Watling Street Bridge No 43

@Merevale Road, Atherstone, North Warwickshire, Warwickshire, England, United Kingdom

Having passed through Atherstone Locks.

2¾ furlongs, 5 locks
A5 (Watling Street) Road Bridge

A5
¾ furlongs, 0 locks
Atherstone Bottom Lock No 11 1 mile, 3¾ furlongs, 5 locks
Grendon Wharf Long Term Moorings

Permit holders only. @Green Lane, North Warwickshire, Warwickshire, England, United Kingdom
3 furlongs, 1 lock

Totals

Total distance is 16 miles, 5¼ furlongs and 11 locks Today’s travel includes at least 1 tunnel (Heath Crescent Tunnel. ).

This is made up of 16 miles, 5¼ furlongs of narrow canals; 11 narrow locks.

This will take 8 hours, 35 minutes which is 1 day, 1 hour and 35 minutes at 7 hours per day. For initial calculation purposes (before adjusting for such things as overnight stops) this is taken as 1 day of 8 hours and 35 minutes.

Standard